Whitaker Family · 1408 Hawthorne Lane · Aspen, CO
One quiet place for every decision that builds the house.
Completion
62%
Phase 4 of 9 · Framing
Pending decisions
7
3 overdue · 4 awaiting client
At-risk selections
3
Lighting & marble lead times
Budget delta
+$58,700
$617,300 of $558,600 allowance
Upcoming lock deadlines
Sorted by schedule risk
Appliance SuiteKitchen · locks before Rough-In26d overdue
Range HoodKitchen · locks before Rough-In26d overdue
Lighting PackageWhole House · locks before Rough Electrical8d overdue
Powder SconcesPowder · locks before Rough Electrical8d overdue
Primary TubPrimary Bath · locks before Rough Plumbing3d
Primary FaucetsPrimary Bath · locks before Rough Plumbing3d
Operational pulse
Approved5 / 24
Ordered3 / 24
Installed2 / 24
At risk3 / 24
Selections at risk
- At riskCalacatta Marble SlabAnn Sacks · 6w lead · locks before Tile
- OverdueLighting PackageApparatus Studio · 12w lead · locks before Rough Electrical
- At riskStair RailingTBD · 10w lead · locks before Trim
What's quietly working
Selections that are sequenced correctly, on schedule, and within allowance. No action required.
White Oak Flooring
Appliance Suite
Kitchen Faucet
Cabinet Hardware
Powder Room Vanity
Exterior Sconces
Mudroom Tile
Wine Room Glass